Chapter 5. Concrete Design and Construction Details

Distributed steel can minimize the number of designed joints required in floor slabs. For example, it may be desirable for a mixing and loading pad not to have any joints. Small cracks will occur, but sufficient amounts of distributed steel hold these small distributed cracks together tightly to allow load transfer due to aggregate interlock.

اقرأ أكثر

How do you calculate steel for a slab ...

The quantity is done in two steps. ... FORMULA = (L) + (2 x Ld) + (1 x 0.42D) – (2 x 1d) How many square feet does a slab of steel need? Steel required in slab per square feet: Steel required in roof slab depends on types of building structure residential, commercial, industrial, multistorey, institutional, slab type, support condition, live ...

اقرأ أكثر

Rebar Calculator

Sep 15, 2015· Rebar Calc in Spanish. The Rebar Calculator is now available in Spanish. It has Spanish language descriptions, labels and diagrams and it also has default units in the metric system (SI). The lengths are in meters and centimeters, the areas are in square meters, the volumes are in cubic meters, and the weights are in kilograms and metric tons.

اقرأ أكثر

Quantity notes pdf - SlideShare

Sep 14, 2018· Add all the weight to get the total steel quantity. NOTE – 1. Minimum % of steel as per Indian standard are: 1. Beam (Teinsion reinforcement): As = 0.85bd/fy of gross cross-section area. 2. Slab – 0.12% of total area 3. Column – 0.8% of cs area 2. Maximum % steel as per Indian standard are: Beam – 4 % of cross-section area. Slab – 4% ...

اقرأ أكثر

How much quantity of steel required for 1m3 concrete ...

Thumb rule for steel in slab = 1% to 1.5%. Minimum quantity of steel required for 1m3 concrete slab is 1%, now 1% of 1m3 = 0.01 m3, and we know that 1m3 steel weight is 7850 Kg, so weight of 0.01m3 steel = 0.01 × 7850 = 78.50 kg, …

اقرأ أكثر

How much quantity of steel required for 1m3 concrete?

Jun 06, 2020· Quantity of steel in concrete depending on type of structure and load of structure. For Foundation :- 0.5 to 0.8 % steel are required; Let we take minimum 0.5 % of steel is required on 1 m3 concrete. Then quantity of steel. = (0.5/100)×1× 7850 = 39.25 kg

اقرأ أكثر

Steel Quantity Calculation | Quantity of Steel for RCC Beam

4. Total Steel Weight for RCC Slab. Sum of weights of main bars and distribution bars for steel for a slab equals the total quantity needed for the slab. 133.77 kg plus 37.87 kg is the total amount of steel required for a slab. A total of 172.646 kg of steel is required for a slab. To get more details, watch the following video tutorial.

اقرأ أكثر

Steel Quantity Calculation Excel Sheet

Dec 08, 2019· iv) Cover Details: Side Cover, Top & Bottom Cover for Slab. 2) Assumption. i) Bent up bar has bent up angle 45°.. ii) All Bent ups are provided at Effective Span/4 Distance as per IS.. iii) Standard Hooks length is taken as 9D (D = Diameter of steel bars). iv) The supporting wall has a fix width of 300 mm or 0.3 m.

اقرأ أكثر

How to Estimate the Cost of a Steel Superstructure for a ...

051200 – Structural Steel Framing 053100 – Steel Decking Brief Description A structural steel framed building is a good choice for many reasons. Steel is a very strong material with a high strength to weight ratio, and as it is shop fabricated, it lends itself to maintaining tight tolerances.

اقرأ أكثر

Steel Quantity Calculator | Steel Weight Calculator ...

Weight of steel in ton. 2.40 ton. Steel Quantity Calculation. Steel quantity = Member type×Concrete qauntity Steel quantity = Member type × Concrete qauntity. Steel quantity =80×30 Steel quantity = 80 × 30. Total Quantity = 2400.00 kg or 2.40 ton.

اقرأ أكثر

How to Calculate Quantity of Steel in slab. - YouTube

Mar 31, 2017· BBS for Slab.In This channel You can Learn about Civil Engineering Update Videos which are using generally in civil Engineering. So please subscribe our cha...

اقرأ أكثر

How much steel required for 1000 sq ft roof slab? - Civil Sir

Thumb rule for Steel required for RCC slab is 80 kgs/m3, then quantity of steel required for 1000 sq ft ( 9.44 m3) rcc slab is equal to = 80 × 9.44 = 755 Kgs. Ans. :-755 Kgs steel quantity are required for 1000 sq ft 4 inch thick rcc roof slab.

اقرأ أكثر

Quantity of steel for 1000 sft slab - Weight of Steel for ...

Aug 08, 2019· #Civil Engineers#CivilMasterQuantity of steel for 1sftQuantity of steel for G+1Quantity of steel for G+5Quantity of steel for 2 storey buildingQuantity of st...

اقرأ أكثر

How to Calculate Slab Steel Quantity from Drawing - W R Eng.

Apr 08, 2021· Slab Beam Location PDF File. Here many beam shows. So we calculate TB1 Beam. TB1 Beam. Numbers of bars for Stirrups Suppose the spacing of stirrups is 200 c/c and the length along which they are placed is 14100 mm, we …

اقرأ أكثر

Forming a Concrete Slab - How to build Forms and Pour a ...

8. Once the slab is square we pound a nail in each corner and run a string around the perimeter of the slab forms. We use the string to straighten the forms while we stake the rest of the boards. Hammer a stake about every 4 to 5 feet to keep the forms straight when you pour the concrete for the slab. 9.

اقرأ أكثر

Calculate Steel Quantity in Beam | Steel Quantity Formula

Furthermore, it's an easy as well as convenient process to compute steel quantity with regard to a sort of beam. Approximation or computation of steel reinforcement quantity with regard to concrete footing, slab, as well as beams, column and so forth is vital for the price/cost estimation with regard to the construction.

اقرأ أكثر

How to Calculate the Quantity of shuttering With 1 Example

Oct 22, 2017· Suppose we have a covered area is 200o square feet and over there we need to construct the R.C.C slab. So we need to calculate the quantity to tell the contractor. 1. To calculate the quantity of Shuttering Plywood, Nails, Shuttering oil, ... Steel plate vali shuttering ka bhi bta do sir or column ka kse nikalte h. maddy November 2, 2017 Reply.

اقرأ أكثر

How much steel is RCC slab? - FindAnyAnswer.com

Apr 24, 2020· RCC slab volume can be found by multiplying the thickness with the area of the slab. Now generally we consider the amount of steel in any concrete member is 2% of the concrete volume. So subtracting the steel amount one can easily find the concrete volume. How many kg of steel is required in 1m3 of concrete? One cubic metre of concrete weighs 2 ...

اقرأ أكثر

How to calculate steel quantity for slab, footing, column ...

Answer (1 of 16): Yes, i will try to anwer with assume the size myself * Calculate steel quantity for slab * * example we will make concrete slab with dimension 4m x 8m, with tickness 12 cm, steel to used 100–200 (its means steel with diametre 100 cm …

اقرأ أكثر

Concrete Calculator - Ultimate Concrete Estimation Tool ...

Convert dimensions to feet if they aren't already. Conversion calculators make it easy to convert inches, yards, or meters to feet.; Multiply the width times the length times the height (W × L × H), or use our volume calculator to find the cubic feet.; Convert the volume to cubic yards from cubic feet. To do so, divide the cubic footage by 27 to get the yards of concrete needed.

اقرأ أكثر

Steel Calculation For Circular RCC Slab | Slab Steel ...

Instance A – Compute simply main steel for provided circular slab with 20'2" diameter. The main steel is number 4 @6" c/c. Assume 1" as concrete cover. Resolution – Computation for main bars. Slab clear diameter = 20'2" – 2(concrete cover) = 20'2"- 2(1) = 20 ft

اقرأ أكثر

HOW TO APPROXIMATELY CALCULATE QUANTITY OF STEEL …

HOW TO APPROXIMATELY CALCULATE QUANTITY OF STEEL BARS IN BEAMS, COLUMNS AND SLAB WITHOUT BAR BENDING SCHEDULE,steel bar weight, quantity of steel bars,calculation of steel bar in slab beam column,steel in concrete

اقرأ أكثر

How to calculate the wastage of steel and concrete in ...

Answer (1 of 4): Good question. There are two distinct aspects of the issue. 1.Calculation of the wastage of various materials during the estimation stage. (Pre -construction) Usually, 5% of wastage is considered on the quantity of cement whereas …

اقرأ أكثر

Thumb Rules used in the Construction by Civil Engineering

Dec 14, 2018· How to calculate the steel quantity of slab having the Length, width, and depth of the slab is 5m x 4m x 0.15m. Step 1: Calculate the Volume of Concrete. Total Volume of Concrete for above given Slab is 5 x 4 x 0.15 = 3m 3. Step …

اقرأ أكثر

What is the percentage of steel in reinforced concrete?

Jan 19, 2020· Typical values for continuously reinforced concrete pavement, for instance, are between 0.6 and 0.7 percent. Find the rebar-to-spacing multiplier with the formula M = 0.9_sqrt(Pt), with 'P' representing the percentage of steel required and 't' representing the thickness of the slab.

اقرأ أكثر

How to Calculate Steel Quantity for Slab? - Reinforcement ...

Thickness of Slab – 150 mm ; One Way Slab Bar Bending Schedule Calculation. Step 1 . FIrst, find number of rods required for main reinforcement and distribution. Number of Required Bars Formula = (Length of slab / spacing) + 1. Number of Main Bars = …

اقرأ أكثر

STRUCTURAL DESIGN CALCULATIONS

To take into account the troughs of the profiled steel sheeting, the weight of the slab is taken as : 7.58 x 2.3 = 17.434 kN/m Self weight of the beam : (100× 9.81) × 10 -3 =0.98 kN/m

اقرأ أكثر

How to calculate quantity of Steel per M³ for Slab, Lintel ...

In the special civil engineering article, it will be guided in what way to compute Steel quantity for each M³ for Lintel, Slab, Beam, Foundation and Column. Least/Minimum steel percentage is equal to 0.7 percent. Steel Quantity is …

اقرأ أكثر

Important Thumb Rules For Estimation In Civil Engineering

Dec 26, 2020· Must Read: How to calculate steel weight for Reinforcement. Example calculation: Steel quantity = Volume of Concrete x Density of Steel x % of Steel. For example, if a volume of concrete 1 m 3 for a slab. Approx Steel requirement = 1 x 7850 x 1% = 78.5 Kg/m 3. Read: Bar bending Shape codes. Thumb rule for shuttering work

اقرأ أكثر

Steel Building Foundation Requirements Guide | BuildingsGuide

Floating Slab. A combination of slab and curb foundations, the floating foundation is one of the most common foundations used today in all kinds of construction. If the building is being constructed on a flat surface, a curb with footings is poured first, and while that is setting and curing, a slab is poured inside of the curb, which will serve as the floor for the completed building.

اقرأ أكثر

Design and Calculation of Formwork Requirement of Slabs ...

May 22, 2018· In Nigeria, the standard given below works for normally proportioned reinforced concrete slabs. Sheathing – 20mm thick marine plywood Joists – 200mm deep wooden H-beams spaced at 600 mm c/c Stringers – 200mm deep wooden H-beams spaced at 1000 mm c/c Shores – Steel props spaced at 1000 mm c/c. For low cost construction, the following can be used;

اقرأ أكثر

Can anyone tell me how steel quantity is calculated in the ...

Nov 04, 2020· Why weight of Steel bars is needed ? For finding out how much quantity of steel bars we need to buy for the work. For keeping an account of how much steel bars have been actually consumed in the RCC work. For giving a reconciliation to the client regarding the steel bars issued and consumed. For making a bill of the steel bars . Method 01 :

اقرأ أكثر

How much steel required for 100 sq ft rcc roof slab ...

Thumb rule for Steel required for RCC slab is 80 kgs/m3, then quantity of steel required for 100 sq ft ( 0.944 m3) rcc slab is equal to = 80 × 0.944 = 75.5 Kgs. Ans. :-75.5 Kgs steel quantity are required for 100 sq ft 4 inch thick rcc roof slab.

اقرأ أكثر

How to Calculate Slab Steel Quantity from Drawing | BBS of ...

'L' for column main steel in footing should be considered as minimum 30cm/as specified. For bent up bar add 0.42d in a straight length of the bar where'd' is the clear depth of beam/slab. Steel Quantity Calculation (Calculation of bars no's): first, calculate the number of bars required (main and distribution both). Formula = (total ...